Steel Buildings in Burnaby, pre-engineered vs custom-fabricated, and how to choose

Steel building options for Burnaby commercial and industrial sites, pre-engineered metal buildings (PEMB) vs custom structural steel fabrication, scope, code, and cost drivers, from a Burnaby fabricator.

“Steel building” gets used as a single term that actually covers two different products with very different design, procurement, and construction realities. A pre-engineered metal building (PEMB), the kind ordered from a catalogue and shipped as a kit, is one thing. A custom-fabricated structural steel building, designed for a specific site and use case by a structural engineer and built by a fabrication shop, is something else.

This post is a Burnaby-specific look at when each system is the right answer, what is in scope for a custom structural steel package, and how the procurement process actually works in this city’s commercial and light industrial market. Our shop on Douglas Road is on the custom side of this, we are not a PEMB dealer, and most of the structural steel work we deliver is for projects where the kit approach was not the right fit.

For the broader cross-Metro structural steel discussion, our structural steel guide for BC covers the basics. This post is for the Burnaby project where the procurement decision between PEMB and custom is on the table.

What a PEMB actually is

A pre-engineered metal building is a kit. A supplier, Steelmaster, Mueller, Behlen, Robertson, Varco Pruden, and others, designs a standardized catalogue of building footprints, eave heights, roof slopes, and bay sizes. The customer specifies dimensions and load requirements, the supplier runs the design through their proprietary engineering software, the kit is fabricated at a large facility (often outside BC), and it ships to site as a labeled bundle of columns, rafters, purlins, girts, and bracing with bolted connections.

The kit’s structural design comes pre-sealed by the PEMB supplier’s engineers. The site-specific elements, foundations, anchor bolts, integration with adjacent buildings, mechanical and electrical systems, are designed by local engineers and sometimes detailed by the GC.

PEMB is faster, cheaper per square foot, and well-suited to simple geometries. It dominates rural agricultural buildings, basic warehouses, light industrial structures, and a meaningful portion of strip commercial. The trade-off is design flexibility, anything outside the catalogue is impossible, and even modifications inside the catalogue can be expensive.

What custom structural steel is

Custom structural steel starts with an architect’s drawing of a building and a structural engineer’s design of the steel frame for that building. The engineer specifies every column, beam, brace, and connection. The fabrication shop produces detailed shop drawings from the engineer’s drawings, the GC procures the steel members, the shop fabricates everything, finishes apply, and the steel goes to site for erection.

This is the path for any building with non-standard architecture, multi-storey construction, mixed use, or specific load conditions. The cost is higher per square foot but the design freedom is total. Custom structural steel is also the only path for projects integrated with masonry, concrete, or curtain wall systems where the steel has to coordinate precisely with other trades.

In Burnaby, custom structural steel dominates the work in mid-rise commercial buildings, mixed-use Brentwood and Edmonds redevelopment projects, hospital and institutional buildings, and any commercial work in dense areas where the building is fitting onto a constrained lot.

When PEMB wins

Three project types where PEMB is usually the right answer:

Warehouse and light industrial single-storey buildings. A 10,000 sq ft warehouse on a Burnaby industrial lot, basic rectangular footprint, 25-foot eave height, no architectural ambition beyond function, PEMB is faster and cheaper, full stop.

Agricultural and equestrian buildings. Hobby farms in Langley, Surrey, and rural parts of Burnaby (Big Bend agricultural areas) routinely use PEMB for barns, equipment storage, riding arenas, and similar functional structures. The kit’s bay flexibility accommodates wide clear spans without intermediate columns.

Self-storage facilities. Repetitive, modular geometry, high cost sensitivity. PEMB is the dominant solution.

When custom wins

Three project types where custom structural steel is required:

Multi-storey commercial and mixed-use. Office buildings, mixed-use retail-with-residential-above, anything more than two storeys with floor-to-floor structural integration. PEMB does not handle this; custom does.

Architecturally exposed structural steel (AESS). When the steel is intended to be visible, exposed columns, feature beams, sculptural truss work in a lobby or atrium, the joinery, finish, and fabrication tolerances of custom structural steel are required. PEMB connections are functional but not visually refined.

Seismic retrofits and additions. Adding a steel moment frame to an existing building, or building an addition that ties into an existing structure, requires custom engineering and custom fabrication. PEMB is a stand-alone kit; it does not integrate.

Custom structural steel scope in Burnaby

A typical custom structural steel package on a Burnaby commercial project includes:

  • Shop drawings. Detailed dimensioned drawings of every member and every connection, developed from the structural engineer’s design and reviewed by the engineer of record before fabrication.
  • Primary structural steel. Columns (W-shapes, HSS), beams (W-shapes, channels), and trusses sized per the engineer’s design.
  • Connections. Bolted shear connections, welded or bolted moment connections, and miscellaneous brackets, all designed by the engineer and detailed by the fabricator.
  • Bracing. Lateral force-resisting elements, diagonal bracing, moment frames, or shear walls, required for wind and seismic.
  • Base plates and anchor bolts. The connection between the steel frame and the concrete foundation. Anchor bolt patterns are critical and have to be set in the concrete pour before steel arrives on site.
  • Embed plates. Steel plates cast into concrete walls or beams to provide attachment points for steel members or for curtain wall systems.
  • Miscellaneous metals. Stair stringers, ladders, equipment supports, bollards, lintels, and other secondary steel that gets bundled into the structural steel package on most Burnaby projects.

Coordinating all of this with the architect’s drawings, the engineer’s calculations, the GC’s schedule, and the other trades is what a structural steel fabrication shop actually does. The work is much more about coordination and document management than it is about welding metal, though the welding, performed under CWB-certified procedures, has to be right too.

Burnaby zoning and permit considerations

Steel building work in Burnaby goes through the City’s permits and applications service. Zoning by neighbourhood matters significantly:

  • Big Bend. Light industrial and limited commercial, with environmental setbacks along the Fraser River and protected creeks. Most warehouse and light industrial PEMB work in Burnaby happens here.
  • Lougheed corridor. Mixed commercial and light industrial. Custom structural steel for mixed-use buildings dominates the recent work.
  • Production Way industrial area. Dedicated light industrial. PEMB is common; custom structural steel for buildings with office components is also common.
  • Brentwood and Edmonds. High-density mixed-use redevelopment. Almost exclusively custom structural steel for multi-storey residential and mixed-use towers.
  • Mountain (UniverCity, SFU). Limited commercial; mostly residential. Custom structural steel for institutional and residential mid-rise.

Foundation and seismic considerations

Burnaby’s soil conditions vary significantly. The Heights and Capitol Hill have shallow bedrock and good bearing capacity. Big Bend and the lower elevations near the Fraser River have softer alluvial soils and potential for liquefaction in seismic events. The seismic design category for Burnaby per the BC Building Code reflects the regional seismic hazard.

A geotechnical engineer assesses soil bearing capacity, frost depth, groundwater, and seismic site classification before foundation design. For most Burnaby commercial steel buildings, this means a thickened-edge slab on grade with isolated footings (lighter buildings) or pile-supported foundations (heavier buildings or weaker soils). On Brentwood and Edmonds high-rise redevelopment, foundation systems extend much deeper to handle the multi-storey loads.

For a structural steel package quote on a specific Burnaby project, request a quote, the structural engineer’s drawings, the architectural drawings, and the project schedule are required to produce a meaningful number. We can advise on the PEMB-vs-custom decision early in design if it is unclear which path fits the project.

Related topics

  • steel buildings Burnaby
  • pre-engineered vs custom structural steel
  • commercial industrial steel building
  • structural steel package Burnaby
  • Metro Vancouver steel building

FAQ

Related questions

These FAQs are included only where the article topic naturally supports them.

What is the difference between a pre-engineered metal building (PEMB) and a custom-fabricated structural steel building?

A pre-engineered metal building (PEMB) is a kit-style steel structure designed and fabricated by a single supplier from a standardized catalogue of bay sizes, eave heights, and roof slopes. Custom-fabricated structural steel is designed for a specific site by a structural engineer and fabricated by a [Canadian Welding Bureau](https://www.cwbgroup.org/) certified shop to the specific architectural and structural drawings. PEMB is faster and lower-cost on simple commercial and industrial buildings; custom is required when the architecture, the loads, or the use case is non-standard.

When does a Burnaby project make sense as a PEMB vs custom structural steel?

PEMB works for warehouse, light industrial, agricultural, and basic commercial buildings where the rectangular bay layout, standard wall-and-roof system, and limited architectural ambition fit the catalogue. Custom structural steel is required for multi-storey buildings, mixed-use occupancies, projects with significant architectural exposure (curtain wall, exposed structural feature elements), seismic upgrades on existing buildings, and any project where the building integrates with site-specific conditions a kit cannot accommodate.

What does Jeff and Simon Ironworks do for steel buildings in Burnaby?

We are a custom structural steel fabrication shop, not a PEMB dealer. We fabricate the structural steel frame, columns, beams, connections, bracing, embed plates, and miscellaneous metals, for custom commercial, industrial, and residential structural projects in Burnaby and across Metro Vancouver. We work to the structural engineer's sealed drawings and the architect's project specifications. PEMB suppliers are a separate part of the industry; we are sometimes called in by GCs to fabricate the misc. metals on a PEMB project where the kit doesn't cover certain custom elements.

What is included in a custom structural steel package for a Burnaby commercial project?

A typical structural steel package includes: shop drawings developed from the engineer's sealed structural drawings, fabrication of all structural columns and beams (W-shapes, HSS, channels), shear and moment connections (bolted or welded per the engineer's spec), bracing and stiffeners, base plates and anchor bolts, embed plates for curtain wall and other building elements, and shop priming or galvanizing per the project spec. Erection on site is sometimes included and sometimes a separate steel erector. We cover the typical scope in our [what a structural steel package includes](/news/what-structural-steel-package-includes-vancouver/) post.

How long does a custom structural steel project take in Burnaby?

From issued-for-construction structural drawings to completed erection on a typical Burnaby commercial steel frame: 3 to 4 weeks for shop drawings and engineer review, 4 to 6 weeks for fabrication, 1 to 2 weeks for shop primer or hot-dip galvanizing, 1 to 3 weeks for erection on site depending on building size. Total schedule typically runs 12 to 16 weeks for a single-storey commercial frame, 16 to 24 weeks for a multi-storey building. Larger projects compress with parallel fabrication of different building sections.

Are PEMB suppliers in BC code-compliant?

Reputable PEMB suppliers design to the National Building Code of Canada and the [BC Building Code](https://www2.gov.bc.ca/gov/content/industry/construction-industry/building-codes-standards/bc-codes), with snow, wind, and seismic loads appropriate to the project location. The PEMB supplier provides sealed engineering for the kit; site-specific loads (foundations, anchorage, special connections) require a local structural engineer to coordinate. The most common gap is at the connection between the kit and site-specific elements, clarity on responsibility scope avoids problems.

What zoning matters for steel buildings in Burnaby?

Burnaby's zoning bylaw governs allowed uses, height limits, setbacks, and lot coverage by zone. Light industrial and commercial corridors in Big Bend, Lougheed, Production Way, and along Marine Drive accommodate steel buildings; mixed-use and residential zones generally do not. The City of Burnaby provides zoning information through its [permits and applications service](https://www.burnaby.ca/services-and-payments/permits-and-applications). Confirm zoning, setbacks, and use compatibility before committing to a building location.

What kind of foundations does a steel building need in Burnaby?

Foundations depend on building loads, soil conditions, and seismic requirements. Most Burnaby commercial and industrial steel buildings use a thickened-edge slab on grade with isolated column footings, or a continuous strip footing, or pile-supported foundations on weaker soils. Soil bearing capacity and groundwater levels vary across Burnaby, Big Bend (lower elevations near the Fraser River) often has weaker soils than the Heights or Capitol Hill bedrock. A geotechnical engineer's site-specific recommendations are required before foundation design.

Can a steel building in Burnaby be insulated and finished as office or retail space?

Yes. Both PEMB and custom structural steel buildings can accommodate insulated wall and roof systems, and the interior can be finished as office, retail, light manufacturing, or any other allowed use. PEMB suppliers typically offer integrated insulated panel options as part of their kit; custom structural steel buildings use whatever wall and roof system the architect specifies (insulated metal panels, conventional framing, masonry infill). The interior finish quality is independent of the structural system.

What's the typical cost difference between PEMB and custom structural steel in Burnaby?

On a basic warehouse or light industrial single-storey building, PEMB is usually 10 to 25% less expensive than equivalent custom structural steel because of the standardized engineering and high-volume fabrication efficiencies. The cost gap narrows or reverses on multi-storey buildings, projects with significant architectural ambition, or buildings with non-standard load conditions. Each project should be priced both ways early in design if the use case is in the overlap zone.

Related reading

More fabrication topics from Jeff and Simon

Related articles from our blog on metalwork, fabrication, and project planning.

Get in touch

Need help applying this to a real project?

Use the article as background, then send the actual fabrication scope, municipality, drawings, or dimensions so Jeff and Simon can review the next step.